Challenge
Incorporate LED lighting, structural steel, while meeting ASHRAE Standard 170 Ventilation of Health Care Facilities.
Solution
ACI worked with architects, engineers and contractor to install a fully integrated operating room ceiling systems that met the needs of several medical equipment manufacturers inside an operating room. Being one of ACI first fully integrated projects, it was very educational with regard to timeline and trade impacts. ACI strives to learn from each project and apply that knowledge to the next.
Product
Product